Precisely constructed, steadily advancing. Project construction is improving and accelerating. Let's take a look at the bustling construction site of the Kevit project.
Release time:
2026-07-04
On the land of Guangxi, a modern new material production base that holds expectations for regional industrial upgrading is rising. This is the construction site of the production project of Guangxi Kaiweite New Materials Co., Ltd., which involves an annual production capacity of 20,000 tons of alkali-free liquid rapid-setting agent and 100,000 tons of alkali-free powdered rapid-setting agent. It is constructed by Guangxi Zuojiang Science and Technology Construction Co., Ltd. (hereinafter referred to as "Zuojiang Science and Technology").
Since the project officially started construction, the Leftjiang Technology and Industry Project Department has always adhered to the concept of "meticulous construction and standardized management", prioritizing safety production and project quality. The project department has achieved synchronized construction of different areas and seamless connection of processes through coordinating cross-professional construction and scientifically allocating human resources and mechanical equipment. The strict implementation of daily routine inspection and control has been driving the project to steadily accelerate and continuously set new records for the "Leftjiang Technology and Industry speed".
Strengthening the foundation: Scientifically designing to build a solid safety foundation
As a newly-built comprehensive project, this project has a scientifically reasonable overall functional layout and a complete range of business types. It includes production workshops, various specialized storage warehouses, comprehensive office buildings, as well as complete supporting auxiliary facilities. It can fully meet the diverse needs such as subsequent production operations, office use, and storage.
In terms of engineering structure design, the Leftjiang Engineering Co., Ltd. tailors construction plans specifically according to the functional attributes of different buildings, taking into account both practicality and safety:
The main production workshop adopts a composite structure form, integrating the advantages of frame structure and portal steel frame structure, and perfectly meeting the diverse production operation requirements.
The ancillary buildings such as the comprehensive building, power distribution facilities, and duty rooms adopt a highly stable reinforced concrete frame structure, which is sturdy, durable and has a high safety factor.
All types of storage warehouses uniformly adopt door-type steel frame structures that are suitable for large spaces and large spans. This design ensures high space utilization and excellent structural performance.
In addition, the entire project adopts standardized pile foundation construction techniques, effectively enhancing the bearing capacity of the foundation and the stability of the building. During the construction process, strict adherence to the seismic design standards of the industry is maintained, ensuring the quality of the project from the very beginning and laying a solid foundation for project safety construction.

Accelerate through multiple advancements: Multiple processes achieve efficient collaboration to achieve "speed boost"
At the construction site, the operation mode of "multiple points in parallel and zone-based construction" was adhered to. The project department, by rationally allocating human resources, equipment and material resources, steadily advanced various processes such as steel structure installation, wall decoration, and mechanical and electrical pre-embedding. The site was in good order and the progress was steadily increasing.

The construction of the storage area is proceeding in an orderly manner:
The dry powder warehouse focuses on the installation work of interior wall panels. The construction workers strictly follow the standards, meticulously complete the assembly and fixation of the panels, strictly control the details, and ensure the quality of the wall construction.
The finished product warehouse and the hazardous solid waste warehouse are simultaneously carrying out the steel structure installation work. They precisely control the alignment and installation fixation of the components, and steadily promote the formation and completion of the main steel structure.
The decoration and renovation of the factory buildings have been fully underway: The interior and exterior decoration works of Building No. 1 are proceeding simultaneously. The meticulous polishing of the interior walls has been meticulously broken down into multiple steps, laying a solid foundation for the subsequent processes; The exterior plastering construction strictly adheres to the technical standards to ensure the flatness and regularity of the exterior facade, enhancing the overall appearance and protective performance of the building.
Supporting facilities construction is carried out simultaneously: The comprehensive building focuses on conducting pipeline trenching for water and electricity. The construction personnel accurately position the pipeline layout, follow standardized operation procedures, ensure high-quality and quantity completion of the preparatory construction tasks, and lay a solid foundation for the subsequent pipeline laying.

Lean Management: Ensuring "Overall Quality" through "Process Excellence"
In the face of a complex situation involving multiple units conducting construction simultaneously and frequent changes in work types, the Leftjiang Engineering Project Department insisted on holding daily production scheduling meetings. They precisely coordinated personnel, materials, and mechanical resources, reasonably divided responsibility zones and clearly defined node targets. Through efficient scheduling management, they achieved smooth and orderly progress of multiple processes such as steel structure hoisting, masonry and plastering, putty application, and pipeline pre-burial.
Constantly maintaining safe and civilized construction practices:
The project department continuously conducts pre-shift safety education and special inspections.
For risk areas such as high-altitude work, temporary electricity use, and lifting and hoisting operations, we strictly implement the special plan and on-site supervision system to ensure that the entire construction process is under safe control.
Striving for excellence in quality control:
Inspection of the arrival of reinforcing materials and inspection of process handover.
Implement the stock-taking and inspection system to ensure "overall quality" through "process excellence", laying a solid foundation for the creation of high-quality projects.

Crafted with great care, aiming for the future.
In the next stage, all the staff of the Zuojiang Science and Technology Project Department will continue to stay at their posts, concentrate their efforts, and implement safety and quality control work in a regular and standardized manner with a rigorous construction attitude and a standardized construction process. At the same time, they will continuously optimize the construction plans and reasonably allocate various resources. Under the premise of ensuring safety and quality, they will accelerate the progress of each construction node, steadily promote the high-quality construction of the project, and strive to create a high-quality project that can reassure the owners and satisfy the society!

Guangxi Zuojiang Science and Technology Construction Co., Ltd. is located in Nanning Airport Economic Zone (Fushui County, Chongzuo City, Guangxi Province). The company has the capabilities for construction, municipal engineering, steel structure, decoration and renovation, as well as mechanical and electrical engineering general contracting. It provides a full-process service including design, manufacturing, construction, and construction management. We warmly welcome overseas merchants to visit and inspect, discuss cooperation, and jointly seek development.

Previous article