Innovative Design Ensures Quality, Bold Progress Sets New Course ——Dalton Paint and Coatings Production Base Construction Project
Release time:
2026-07-10
In order to strictly implement the overall deployment of the project construction, Guangxi Zuojiang Science and Technology Construction Co., Ltd. (hereinafter referred to as "Zuojiang Science and Technology") took a refined, standardized and regulated on-site management system as the starting point, and fully advanced the construction work of the paint and coating production base project of Guangxi Dalton Chemical Technology Co., Ltd., ensuring the simultaneous progress of safety, quality and schedule.
Since the project started, all the management personnel of the project department have remained at their posts, fulfilled their responsibilities, scientifically planned the construction procedures, reasonably allocated human, machinery and material resources, regularly carried out safety inspections, technical control and quality acceptance work, and continuously optimized the on-site construction environment. The construction of each single project has been advancing steadily, and the overall construction order is standardized, with a stable and improving construction trend.

Guarding stability, building a solid foundation with dual lines
Safety is the lifeline.
Safe production is of paramount importance. The project department has always adhered to the principle of "safety first", strictly implementing the three-level safety education for all new arrivals. This ensures that safety awareness is deeply rooted in everyone's mind. The edge protection around the foundation pits on the site is in place according to regulations, with prominent safety slogans, and the electrical boxes and cables have a daily inspection system. Through regular hazard inspections and closed-loop rectifications, the safety situation on site has remained stable, providing a solid guarantee for the efficient progress of the project.
In response to the special requirements of the explosion-proof areas in the chemical plant, the project team focused on strengthening the basic work of lightning protection and grounding. In strict accordance with the "Building Lightning Protection Design Code" GB50057-2010, they conducted a comprehensive inspection and improvement of the lightning protection devices in the explosion-proof areas, ensuring that the down conductors and grounding devices form a complete lightning protection system. At the same time, they conducted a special inspection of the grounding of electrical equipment in the explosion-proof areas to ensure that the grounding resistance complies with the specifications, effectively eliminating the risks of static accumulation and electrical sparks caused by poor grounding, and eliminating safety risks at the root.
During the construction of the water pool, the project team regarded preventing leakage as the top priority in safety management. They adopted a dual protection measure of anti-seepage membranes and anti-seepage concrete, and carried out meticulous construction on the bottom and side walls of the fire water pool and production water pool. They also conducted quality inspections layer by layer to ensure there were no leakage risks. This measure fundamentally reduced the pollution of groundwater and structural safety hazards, providing a strong guarantee for the long-term safe operation of the project.
Quality is the soul.
The project team strictly controlled every process, from foundation construction to pier cap pouring, from steel bar binding to concrete curing, all of which were carried out to high standards. Scientific foundation treatment and meticulous construction effectively enhanced the bearing capacity and overall stability of the foundation. In the lightning protection and grounding construction, the project team strictly controlled the welding quality and anti-corrosion treatment to ensure that the grounding body and grounding lead-down lines were reliably connected and had strong durability, providing a solid guarantee for the safe operation of subsequent chemical production equipment. Every detail refinement demonstrates the leftjiang science and technology's persistent pursuit of excellent quality.

Congratulations on reaching the summit of success! The comprehensive building has been successfully completed.
Last month, the project reached an exciting milestone - the main structure of the comprehensive building was successfully completed and topped out!
This victory marks the comprehensive transition of the comprehensive building project to the second-level structure and decoration and renovation stages. The topping out not only fully affirms the quality of the previous construction, but also greatly boosts the morale of all the construction workers. The project department will seize the opportunity and continue to keep the safety string tight, ensure quality, accelerate the construction schedule, and guarantee that the subsequent construction of the comprehensive building is completed with high standards and efficiency.

Multiply achievements and trigger a construction boom
Currently, the project has fully entered the critical stage where the upper structure and decoration and renovation are carried out concurrently. The project team has carried out scientific planning and reasonable scheduling, and multiple construction sites have simultaneously started construction, covering the entire scope:
The installation of steel structures for the production plant, Class A warehouses, and Class C warehouses, as well as the construction of the indoor floors, are all progressing smoothly.
The secondary structure construction of the comprehensive building is advancing steadily, and the decoration and renovation work of the building is gradually commencing.
The construction of the structures above the zero-meter level of the fire water tank and the power distribution room is also in full swing.
Each team worked in perfect harmony, and the construction site presented a scene of great activity and orderliness.

Push forward and set sail together, jointly drawing up the blueprint for development
As the construction of each individual project progresses continuously, the entire project is steadily moving towards the set goals. This modern coating production base, which integrates production, storage and office functions, will inject strong impetus into the regional industrial development in the future.
The Leftjiang Industrial Technology Company will continue to adhere to high standards and strict requirements, and will spare no effort to promote the subsequent construction projects. We will ensure that the project is delivered safely, of high quality, and efficiently on schedule, creating a quality project for the owner and contributing to the development of the city through construction.

Guangxi Zuojiang Engineering Construction Co., Ltd. is located in Nanning Airport Economic Zone (Fushui County, Chongzuo City, Guangxi). The company has the capabilities for construction, municipal engineering, steel structure, decoration and renovation, as well as mechanical and electrical engineering general contracting. It provides a full-process service including design, manufacturing, construction, and construction management. We warmly welcome overseas merchants to visit and inspect, discuss cooperation, and jointly seek development.

Previous article