News

General Contracting Enterprise for Construction

Good news! Lithium battery recycling and green treatment project has been successfully completed!!


Release time:

2023-10-14

On October 9th, the steel structure project of lithium battery new material processing and resource recovery and recycling project undertaken by Guangxi Zuojiang Science and Industry Construction Co., Ltd. has been completed at this stage, and the owner has been put into use!

 

Project Introduction

The project is located in Nanning City, Guangxi, with a total construction area of 24183.72 square meters, including 1# wet workshop, with a total construction area of 19890.08 square meters on two floors, 4293.64 square meters of comprehensive auxiliary workshop, and a total component weight of about 1540 tons.

 

Project construction site drawing

 

Lithium battery is currently one of the commonly used battery types in new energy vehicles, mobile phones and other electronic products, but the treatment and recycling of its waste lithium batteries faces some technical and environmental protection problems. In this project, the physical dismantling of waste lithium batteries and the wet recycling production line of valuable metals can realize the extraction of a large number of core metal materials of battery products from waste lithium batteries, realize recycling, and make up for the shortage of resources.

 

Project construction site drawing

 

Project construction site drawing

 

The project is in line with the national industrial policy and development direction, which is conducive to the recovery and recycling of waste resources, and is the need to protect the ecological environment and achieve sustainable development of enterprises. Moreover, the recovery and recycling of waste resources is one of the important ways for China to achieve the vision of carbon peak and carbon neutrality. Not only that, the owner unit is the first enterprise in the region to integrate comprehensive resource recovery such as battery recycling, dismantling, deep processing and reuse.

 

Project construction site drawing

 

At present, the project has been put into use, and we would like to thank all the people involved in the project for their hard work and dedication. At the same time, we would also like to thank the owner unit for their trust and support to our company, and look forward to the next cooperation with the owner unit!